Timely Delivery on Your Schedule

Local Fabric
• 3 days for locally-manufactured Nylon and Polyesters

Taiwan/Korean Sourced Fabric Lead-Times*
• 7 days required for all lab dips
• 14 days to dye fabrics
• 30 days for fabrics not in stock
• 10-14 days required for arrival of material at GC Dongguan

*Lead times are based on 800 yards minimum.

Injection Molding
• 3 days required to calculate mold charge (upon receipt of specifications)
• 15-25 days are needed to make a mold
• 2-5 days required for minor revisions

3D Picture Rendering (CAD/CAM)
Available as an outsourced service. Lead-times vary.

EVA/XPE Thermoforming (Compression molding)
• 5-7 days to prepare mold

Zipper Pulls
• 7 days needed to make mold

Embroidery
• 1-3 days needed upon receiving confirmation of sample**

Silkscreen
• 2-4 days needed to screen an average size logo (7 days for larger prints)**

Rubber Logos
• 2-5 days for rubber molds (4 days for PU)

Accessories
• 2-10 days for generic zipper pulls
• 2-10 days for webbing (logo/special weave)
• 20 days needed for YKK zippers and sliders
• 30 days for accessories from Korea or other countries other than China

** Business days